The brief
The street stayed in use throughout: buses ran to schedule, residents needed access to their driveways, and the new platform had to meet accessibility levels against an existing road surface that was anything but level.
Sweden · 2025
Kerbs, a precast bus stop platform, pedestrian paths and reinstatement delivered for a Swedish municipality on a live residential street.

The street stayed in use throughout: buses ran to schedule, residents needed access to their driveways, and the new platform had to meet accessibility levels against an existing road surface that was anything but level.
We set out the kerb lines and platform levels first, then worked in short sections so no household lost access for more than a day. The precast platform was bedded on a compacted, laser-levelled base, and the pedestrian paths were built up in layers and compacted before surfacing.
A finished stop and footway with correct falls, tactile paving and clean granite kerb lines, handed over on programme with the road reinstated to the municipality's specification.
Client reviews
4.9
out of 5 · 60+ completed projects
“They stripped the old roof and had the new tiles on before the autumn rain. Weekly photos meant we never once had to chase them. The finish around the chimneys is better than the original.”
“From the first site visit to handover it was the same person, and he answered the phone every time. The house was ready on the date written in the contract — I did not think that still happened.”
“The parquet they laid is the first thing every guest comments on. They protected the rest of the flat, worked cleanly, and the final invoice matched the quote to the euro.”
“Our sauna heats evenly, the benches are solid, and two winters later not a single board has moved. They explained every material choice before we paid for anything.”
“They built the terrace on ground screws without touching the garden, wired the lighting, and were gone in days. It has become the room we use most from May to September.”
“A seven-thousand square metre site cleared, graded and replanted around a working kindergarten, with zero disruption to the children. The most organised contractor we have hired.”
Planning something similar? Get your free written quote — reply within one working day.
Line-by-line quote before anything starts. Changes priced and agreed in writing.
No call centre, no handover between departments — your project lead is on site and on the phone from first visit to handover.
Standard for owners who are abroad — most of our clients are not on site each week.
Whether you are a couple or three generations under one roof, the plan is sized to your household.




Enquiry
Send the property details and a short description. We will tell you honestly whether it suits us, what it is likely to involve, and when we could start.