The brief
The house sits in a tight new-build street where deliveries, groundworks and neighbouring plots all shared one access road, and the family had a fixed move-in date to plan around.
Sweden · 2025
A two-storey family house taken from timber frame and insulation through to painted interiors, finished staircase and a levelled, seeded plot.

The house sits in a tight new-build street where deliveries, groundworks and neighbouring plots all shared one access road, and the family had a fixed move-in date to plan around.
We sequenced the build so the shell and roof closed early, then ran insulation, services and boarding as one continuous internal stage. Staircase, doors and finishes went in once the house was dry, and the plot was graded, topsoiled and prepared last so it stayed clean through the fit-out.
A completed family home handed over on the agreed date: painted interiors, finished stair and hallway, utility room ready for appliances, and an entrance, drive and garden area ready for planting.
Client reviews
4.9
out of 5 · 60+ completed projects
“They stripped the old roof and had the new tiles on before the autumn rain. Weekly photos meant we never once had to chase them. The finish around the chimneys is better than the original.”
“From the first site visit to handover it was the same person, and he answered the phone every time. The house was ready on the date written in the contract — I did not think that still happened.”
“The parquet they laid is the first thing every guest comments on. They protected the rest of the flat, worked cleanly, and the final invoice matched the quote to the euro.”
“Our sauna heats evenly, the benches are solid, and two winters later not a single board has moved. They explained every material choice before we paid for anything.”
“They built the terrace on ground screws without touching the garden, wired the lighting, and were gone in days. It has become the room we use most from May to September.”
“A seven-thousand square metre site cleared, graded and replanted around a working kindergarten, with zero disruption to the children. The most organised contractor we have hired.”
Planning something similar? Get your free written quote — reply within one working day.
Line-by-line quote before anything starts. Changes priced and agreed in writing.
No call centre, no handover between departments — your project lead is on site and on the phone from first visit to handover.
Standard for owners who are abroad — most of our clients are not on site each week.
Whether you are a couple or three generations under one roof, the plan is sized to your household.






Enquiry
Send the property details and a short description. We will tell you honestly whether it suits us, what it is likely to involve, and when we could start.